How Much Does It Cost to Build a Pond or Stock Tank in Texas?
One national cost guide puts a farm pond at $3,750 to $13,000, by size and terrain. For farm ponds and lakes of 10 acres or more, the same 2026 guide lists $1,400 to $4,800 per acre. The state extension service’s 2026 Texas survey prices stock tank work by the hour instead. Its statewide average was $167.59 an hour, and $175.00 in the East region.
These are market numbers, not our price list. In this part of Texas, a ranch pond is often called a stock tank. We dig new tanks and clean out old ones as part of our stock tank and pond construction work.
What do published guides say a pond costs?
These ranges mix farm ponds with lakes. Read them as a starting band.
| What is priced | Published range | Source |
|---|---|---|
| Farm pond, whole job | $3,750 to $13,000 | National cost guide, 2026 |
| Farm pond or lake of 10 acres or more, per acre | $1,400 to $4,800 | National cost guide, 2026 |
| Large lake or fishing pond, per acre | $6,700 to $17,735 | National cost guide, 2026 |
| Geotechnical soil report | $1,000 to $5,000 | National cost guide, 2026 |
| Hauling dug dirt away, per cubic yard | $105 to $175 in one guide; $8 to $25 in another | Two national cost guides, 2026 |
| Excavation equipment with an operator, per hour | $100 to $250 | Second national cost guide, 2026 |
| Leveling, per cubic yard | $1 to $12 | Second national cost guide, 2026 |
| Stock tank construction or maintenance, per hour | $167.59 statewide; $175.00 East region | Texas extension custom rates survey, 2026 |
Why do the yards of dirt matter more than the acres?
The federal pond handbook from the Natural Resources Conservation Service (NRCS) is direct about cost. For a dug pond, it says the excavation estimate “determines the cost of the pond.”
An acre-foot is an acre of water one foot deep. That is 43,560 cubic feet, so digging out that much room moves about 1,613 cubic yards. By that math, a half-acre pit dug 6 feet deep on average holds about 3 acre-feet, or 4,840 cubic yards.
The extension survey prices stock tank work by the machine hour. So the size of the tank, the soil and the haul decide the total.
Which costs less, a dug pit or a dam across a draw?
The handbook’s excavated pond is a pit dug in nearly level ground, with storage almost entirely from digging. Its embankment pond puts a dam across a draw deep enough to hold 5 feet or more of water.
For economy, the handbook says to pick the site that stores the most water with the least earthfill. A narrow spot in a draw with steep sides fits that test. A dam still needs a spillway to carry storm water around the fill. Some tanks get their room from both digging and a dam.
On a good draw, a dam can hold more water per yard moved than a pit. On flat ground, the handbook calls a dug pit the simplest to build.
What on the site changes the price?
Soil decides whether a tank holds water. The handbook rates clays and silty clays as excellent, while coarse sand and sand-gravel mixes usually leak too much. Limestone gets its own warning, because hidden cracks below the soil can empty a pond in a short time.
In Eastland County, the federal soil survey rates the clay soils well for a pond. It rates deep sands and shallow rocky ground poorly. Anyone can look up their land on the NRCS Web Soil Survey. The handbook adds test holes, three or four per acre in uniform soil, plus a look at nearby ponds.
A site short on clay costs more to seal. One fix in the handbook is a packed blanket of dirt with at least 20 percent clay. One national guide says bringing clay onto a sandy or rocky site can add cost.
One national guide notes that rocky ground takes more labor to dig. Where ledges sit near the surface, rock excavation with an excavator’s rock hammer adds time. The handbook has the pond area cleared first, and our guide to land clearing cost per acre covers that part.
How much watershed and depth does a tank need?
A tank fed by runoff needs enough land draining to it to hold water through a drought. Too much watershed brings its own bill, the handbook warns, because big storms then need costly overflow work.
The handbook’s minimum depth map runs from 5 feet in wet climates to 12 to 14 feet in arid ones. Drier country calls for deeper water to offset seepage and evaporation losses. The handbook also wants deeper water where a year-round supply is a must or seepage tops 3 inches a month.
What does cleaning out an old tank involve?
Silt washes in from eroding ground above a tank and fills the room that held water. The handbook rates land under permanent grass or tree cover as the most desirable watershed. A cleanout digs the silt back out of the basin. The tank can be deepened or reshaped in the same job.
The extension survey’s 2026 hourly rate covers stock tank construction and maintenance in one line. How much silt comes out, and where it goes, sets the total.
The federal handbook calls hauling dug dirt away expensive and seldom worth it unless the dirt is needed nearby. Spreading it to fill low spots on the place is plain dirt work.
Deepening has a catch. The handbook looks for at least 3 feet of undisturbed tight soil under the water. Dig through that layer, and a tank that held water can start to leak.
Do you need a permit to build a stock tank in Texas?
For the water itself, a livestock tank usually needs no state permit. Texas Water Code Section 11.142 lets a person build a dam or reservoir on their own land without one. It covers domestic and livestock use, up to 200 acre-feet of normal storage.
Texas law also exempts some small private dams from its dam safety rules. The dam must hold under 500 acre-feet at full capacity and carry a low or significant hazard rating. It must also sit outside city limits, in a county under 350,000 people. Owners of exempt dams still follow the state’s upkeep rules.
A dam above homes or a road is a question for an engineer and the state. State law also bars holding back surface water in a way that floods a neighbor’s land. FEMA’s flood map shows whether a site sits in a mapped flood zone. If it does, ask the local floodplain administrator before work starts.
Texas law requires a call to 811 at least two business days before most digging 16 inches or deeper. The state’s pipeline regulator recommends calling before any digging, even on a ranch.
How do you get a real number for your tank?
Hughes Dirt Service is based in Ranger and serves ranches and acreage about 60 miles around it. We dig new stock tanks with our dozer and excavator and clean out silted-in ones. We look at the job and put the quote in writing. Call or text (254) 210-2570, or see how we build and clean out stock tanks.