How Much Does It Cost to Build a Pond or Stock Tank in Texas?

One national cost guide puts a farm pond at $3,750 to $13,000, by size and terrain. For farm ponds and lakes of 10 acres or more, the same 2026 guide lists $1,400 to $4,800 per acre. The state extension service’s 2026 Texas survey prices stock tank work by the hour instead. Its statewide average was $167.59 an hour, and $175.00 in the East region.

These are market numbers, not our price list. In this part of Texas, a ranch pond is often called a stock tank. We dig new tanks and clean out old ones as part of our stock tank and pond construction work.

What do published guides say a pond costs?

These ranges mix farm ponds with lakes. Read them as a starting band.

What is pricedPublished rangeSource
Farm pond, whole job$3,750 to $13,000National cost guide, 2026
Farm pond or lake of 10 acres or more, per acre$1,400 to $4,800National cost guide, 2026
Large lake or fishing pond, per acre$6,700 to $17,735National cost guide, 2026
Geotechnical soil report$1,000 to $5,000National cost guide, 2026
Hauling dug dirt away, per cubic yard$105 to $175 in one guide; $8 to $25 in anotherTwo national cost guides, 2026
Excavation equipment with an operator, per hour$100 to $250Second national cost guide, 2026
Leveling, per cubic yard$1 to $12Second national cost guide, 2026
Stock tank construction or maintenance, per hour$167.59 statewide; $175.00 East regionTexas extension custom rates survey, 2026

Why do the yards of dirt matter more than the acres?

The federal pond handbook from the Natural Resources Conservation Service (NRCS) is direct about cost. For a dug pond, it says the excavation estimate “determines the cost of the pond.”

An acre-foot is an acre of water one foot deep. That is 43,560 cubic feet, so digging out that much room moves about 1,613 cubic yards. By that math, a half-acre pit dug 6 feet deep on average holds about 3 acre-feet, or 4,840 cubic yards.

The extension survey prices stock tank work by the machine hour. So the size of the tank, the soil and the haul decide the total.

Which costs less, a dug pit or a dam across a draw?

The handbook’s excavated pond is a pit dug in nearly level ground, with storage almost entirely from digging. Its embankment pond puts a dam across a draw deep enough to hold 5 feet or more of water.

For economy, the handbook says to pick the site that stores the most water with the least earthfill. A narrow spot in a draw with steep sides fits that test. A dam still needs a spillway to carry storm water around the fill. Some tanks get their room from both digging and a dam.

On a good draw, a dam can hold more water per yard moved than a pit. On flat ground, the handbook calls a dug pit the simplest to build.

What on the site changes the price?

Soil decides whether a tank holds water. The handbook rates clays and silty clays as excellent, while coarse sand and sand-gravel mixes usually leak too much. Limestone gets its own warning, because hidden cracks below the soil can empty a pond in a short time.

In Eastland County, the federal soil survey rates the clay soils well for a pond. It rates deep sands and shallow rocky ground poorly. Anyone can look up their land on the NRCS Web Soil Survey. The handbook adds test holes, three or four per acre in uniform soil, plus a look at nearby ponds.

A site short on clay costs more to seal. One fix in the handbook is a packed blanket of dirt with at least 20 percent clay. One national guide says bringing clay onto a sandy or rocky site can add cost.

One national guide notes that rocky ground takes more labor to dig. Where ledges sit near the surface, rock excavation with an excavator’s rock hammer adds time. The handbook has the pond area cleared first, and our guide to land clearing cost per acre covers that part.

How much watershed and depth does a tank need?

A tank fed by runoff needs enough land draining to it to hold water through a drought. Too much watershed brings its own bill, the handbook warns, because big storms then need costly overflow work.

The handbook’s minimum depth map runs from 5 feet in wet climates to 12 to 14 feet in arid ones. Drier country calls for deeper water to offset seepage and evaporation losses. The handbook also wants deeper water where a year-round supply is a must or seepage tops 3 inches a month.

What does cleaning out an old tank involve?

Silt washes in from eroding ground above a tank and fills the room that held water. The handbook rates land under permanent grass or tree cover as the most desirable watershed. A cleanout digs the silt back out of the basin. The tank can be deepened or reshaped in the same job.

The extension survey’s 2026 hourly rate covers stock tank construction and maintenance in one line. How much silt comes out, and where it goes, sets the total.

The federal handbook calls hauling dug dirt away expensive and seldom worth it unless the dirt is needed nearby. Spreading it to fill low spots on the place is plain dirt work.

Deepening has a catch. The handbook looks for at least 3 feet of undisturbed tight soil under the water. Dig through that layer, and a tank that held water can start to leak.

Do you need a permit to build a stock tank in Texas?

For the water itself, a livestock tank usually needs no state permit. Texas Water Code Section 11.142 lets a person build a dam or reservoir on their own land without one. It covers domestic and livestock use, up to 200 acre-feet of normal storage.

Texas law also exempts some small private dams from its dam safety rules. The dam must hold under 500 acre-feet at full capacity and carry a low or significant hazard rating. It must also sit outside city limits, in a county under 350,000 people. Owners of exempt dams still follow the state’s upkeep rules.

A dam above homes or a road is a question for an engineer and the state. State law also bars holding back surface water in a way that floods a neighbor’s land. FEMA’s flood map shows whether a site sits in a mapped flood zone. If it does, ask the local floodplain administrator before work starts.

Texas law requires a call to 811 at least two business days before most digging 16 inches or deeper. The state’s pipeline regulator recommends calling before any digging, even on a ranch.

How do you get a real number for your tank?

Hughes Dirt Service is based in Ranger and serves ranches and acreage about 60 miles around it. We dig new stock tanks with our dozer and excavator and clean out silted-in ones. We look at the job and put the quote in writing. Call or text (254) 210-2570, or see how we build and clean out stock tanks.

Frequently asked questions

How much does a stock tank cost?
One 2026 national cost guide puts a farm pond at $3,750 to $13,000, by size and terrain. The state extension survey's 2026 statewide average for stock tank work was $167.59 an hour. Depth moves the total, since each acre-foot of room is about 1,613 cubic yards of digging. A good dam site can store more water per yard moved.
Do I need a permit to build a stock tank in Texas?
For the water, usually not. Texas Water Code Section 11.142 covers a dam or reservoir on your own land for domestic and livestock use. Up to 200 acre-feet of normal storage needs no permit. A flood zone or a dam above homes can bring other rules.
How deep should a stock tank be?
Drier country needs deeper water. The federal pond handbook's minimums run from 5 feet in wet climates to 12 to 14 feet in arid ones. It calls for deeper water still where a year-round supply is a must or seepage runs high. In a dug pit, every foot of depth adds digging, so depth trades water held against dirt moved.
What does it cost to clean out an old stock tank?
The state extension survey prices stock tank construction and maintenance together, by the hour. Its 2026 statewide average was $167.59 an hour, and $175.00 in the East region. How much silt comes out and where it goes set the total. Spreading it on the place saves hauling it off.
Will my land hold water in a stock tank?
Soil decides that. The federal handbook rates clay and silty clay as excellent, and coarse sand and sand-gravel mixes as usually unsuitable. Test holes across the site and nearby ponds in the same soil give a good read. Limestone with hidden cracks below the soil is a known risk.
Is there help paying for a livestock pond?
Ask before work starts. The local Natural Resources Conservation Service (NRCS) office can say what programs, if any, apply today.
Is this what Hughes Dirt Service charges?
No. These are market numbers from national cost guides and the state extension survey, not our price list. Each tank comes down to its own site and its own yards of dirt. We look at the job and put the quote in writing, so call or text (254) 210-2570.
Request a Quote

Get In Touch With Hughes Dirt Service

Tell us what the job is and the town it is near, and text us photos if you have them. Call or text (254) 210-2570, or send the form and we will get back to you.

  • Call or text (254) 210-2570
  • Serving Ranger, TX and the towns from Abilene to Weatherford
  • Written quotes · land clearing, dirt work and excavating

Request a Quote

Tell us about the clearing, tank, pad, driveway or teardown and where it is. We look at the job and put the quote in writing.

Call (254) 210-2570